Mostrar registro simples

dc.contributor.advisorBravo, Juan Martínpt_BR
dc.contributor.authorTomazini, Charles Adolfopt_BR
dc.date.accessioned2021-09-02T04:23:17Zpt_BR
dc.date.issued2021pt_BR
dc.identifier.urihttp://hdl.handle.net/10183/229385pt_BR
dc.description.abstractNeste trabalho de conclusão de curso foi desenvolvido um projeto hidrossanitário a fim de resolver um problema atual e iminente que é a escassez mundial de água através do reuso de águas cinzas. Para tanto, utilizou-se técnicas, normas e materiais brasileiros, com ênfase na NBR’s 5626/2020, 8160/1999 e 13969/1997, assim como o Decreto 9369/1988 da Prefeitura Municipal de Porto Alegre com o intuito de facilitar a execução dos profissionais responsáveis. Através dos procedimentos de cálculo disponíveis na documentação técnica supracitada, foram dimensionadas as instalações de abastecimento da concessionária, instalações sanitárias, sistema de coleta de águas cinzas, sistema de recalque e tratamento de águas cinzas, sistema de reservação de água de reuso tratada e sistema de distribuição das águas de reuso. Para as instalações de abastecimento foram dimensionados dois reservatórios, um inferior e outro superior, cada um com capacidade de 6000L e 4000L de reservação, respectivamente. Enquanto para as instalações de reuso, foram dispostos dois reservatórios, um superior e outro inferior, com capacidade de 1000L de reservação cada. No que tange o sistema de tratamento das águas cinzas provenientes dos chuveiros de cada apartamento, foi utilizado um processo de tratamento composto por reator anaeróbio de fluxo ascendente (RAFA), filtro anaeróbio de fluxo ascendente (FAFA), ambos com capacidade de 1600L, Filtro de areia com capacidade de 2000L e flutuador de cloro. Além disso, buscou-se garantir a disponibilidade hídrica do sistema de reuso, ora insuficiente, através do emprego de um sistema de desvio de fluxo de água. Este sistema se dá através de válvulas solenoides para permitir a manobra automática do sistema de recalque da água fria para o reservatório superior de água de reuso tratada. Para a tubulação de coleta de águas cinzas, empregou-se um sistema de manobra que permite desviar a água excedente para o sistema de esgoto cloacal. O mesmo sistema permite que, em caso de manutenção da ETAC (estação de tratamento de águas cinzas) seja possível desviar as águas para a referida tubulação de esgoto. Também foram dimensionadas as bombas do sistema de recalque de água fria utilizando-se duas bombas de 1,5 CV e duas bombas de 3/4 CV para o sistema de recalque de água de reuso. Por fim, se dimensionou a tubulação de distribuição de água de reuso do edifício que abastece os vasos sanitários de cada banheiro.pt_BR
dc.description.abstractIn this course conclusion work, a hydrosanitary project was developed in order to solve a current and imminent problem that is the global water scarcity through the reuse of gray waters. For this purpose, Brazilian techniques, standards and materials were used, with emphasis on NBR's 5626/2020, 8160/1999 and 13969/1997, as well as Decree 9369/1988 of the Porto Alegre City Hall in order to facilitate the execution by the responsible professionals. Through the calculation procedures available in the aforementioned technical documentation, the concessionaire's supply systems, sanitary facilities, gray water collection system, gray water discharge and treatment system, treated water reservation system, and water distribution system were dimensioned. For the supply facilities, two reservoirs were designed, one lower and one upper, each with a capacity of 6000L and 4000L of reserve, respectively. As for the reuse facilities, two reservoirs were placed, one upper and one lower, with a capacity of 1000L of reserve each. Regarding the gray water treatment system from the showers in each apartment, a treatment process consisting of an upward flow anaerobic reactor (RAFA), an upward flow anaerobic filter (FAFA), both with a capacity of 1600L, a sand filter with 2000L capacity and chlorine floating device. In addition, an attempt was made to ensure the water availability of the reuse system, which can be at times insufficient, through the use of a water flow diversion system. This system takes place through solenoid valves to allow automatic maneuvering of the cold water discharge system to the upper treated water reservoir. For the gray water collection pipe, a maneuvering system was used to allow the surplus water to be diverted to the sewage system. The same system allows that, in case of maintenance of the ETAC (gray water treatment plant), it is possible to divert the water to the said sewer pipe. The pumps of the cold water discharge system were also sized using two 1.5 HP pumps and two 3/4 HP pumps for the reuse water discharge system. Finally, the reuse water distribution pipes of the building wich supplies treated water to the the toilets of each bathroom, were dimensioned.en
dc.format.mimetypeapplication/pdfpt_BR
dc.language.isoporpt_BR
dc.rightsOpen Accessen
dc.subjectReúso da águapt_BR
dc.subjectSistemas hidráulicospt_BR
dc.subjectDimensionamento hidráulicopt_BR
dc.titleProjeto hidrossanitário de reuso de águas cinzas com sistema de abastecimento paralelo de água potável para um edifício residencialpt_BR
dc.typeTrabalho de conclusão de graduaçãopt_BR
dc.identifier.nrb001129557pt_BR
dc.degree.grantorUniversidade Federal do Rio Grande do Sulpt_BR
dc.degree.departmentEscola de Engenhariapt_BR
dc.degree.localPorto Alegre, BR-RSpt_BR
dc.degree.date2021pt_BR
dc.degree.graduationEngenharia Civilpt_BR
dc.degree.levelgraduaçãopt_BR


Thumbnail
   

Este item está licenciado na Creative Commons License

Mostrar registro simples